Plastic stone construction drawing method

WPC Floor

Wood plastic floor is a kind of plastic, so it has better elastic…

WPC Wallboard

The wood-plastic wallboard outdoor has excellent anti-aging performance,…

WPC Railing

Wood plastic has better physical and mechanical properties than…

WPC Fence

WPC has the characteristics of environmental protection and energy…

WPC Grape Trellis

WPC has the characteristics of environmental protection and energy…

WPC Grape Trellis

The wood-plastic composite material contains plastic, so it has…

e327 stone plastic floor (light yellow)

Stone-plastic composite flooring, sometimes called stone polymer…

E321 stone plastic floor (European white)

Stone plastic composite (SPC) or solid polymer core is a rigid…

E320 stone plastic floor (light brown)

SPC stands for Stone Polymer Composite, a limestone core combined…

E319 stone plastic floor (dark brown)

SPC stands for Stone Polymer Composite, a limestone core combined…

E318 stone plastic floor (deep coffee)

Stone-plastic composite flooring, sometimes called stone polymer…

E317 stone plastic floor (gray black)

Stone plastic composite (SPC) or solid polymer core is a rigid…

Contact Us

  • Email:
    [email protected]
  • Phone:
    +86 137 6469 2158
  • Address:
    Kunfu Park, Chuanhong Road, Pudong New Area, Shanghai
  • Customer Feedback

    Obtaining free samples

    Engineering Standards Manual: Standard Drawings & Details

     · LANL Standard Drawings and Details either (1) depict required format/content or (2) are templates that are completed by a Design Agency (LANL or external AE) for a design drawing package, in a manner similar to specifications.

    Get price

    Chapter 6: Installation and Construction

    CHAPTER 6: INSTALLATION AND CONSTRUCTION For two, or more, parallel pipes in a common trench, properly compacted backfill is required between pipes. Minimum spacing between pipes may be satisfied by the following (see Table 2): Depending on the type of backfill, the compaction equipment and joining methods, these dimensions may need to be ...

    Get price

    Stormwater Best Management Practices: Concrete Washout

    Construction workers should handle wet concrete and . washout water with care because it may cause skin irritation and eye damage. If the washwater is dumped on the ground (Fig. 1), it can run off the construction site to adjoining roads and enter roadside storm drains, which discharge to surface waters such as rivers, lakes, or estuaries.

    Get price

    Building construction materials

     · Stone • They are used in hydraulic structures like dams and bridges. • They are used in retaining wall masonry to retain soil. • They are used as road metal in road construction. • They are used as ballast for permanent way in railways. • They are used to make concrete in the form of coarse aggregate. 6. Brick Requirements of Bricks…

    Get price

    Methodology and Specification for Repairs to Masonry

    3.2.1 Where stone repairs are specified, an assessment will be made on site as to the most appropriate method using the joint experience and expertise of the stone mason and architect. This should be undertaken as soon as close inspection (through erection of a …

    Get price

    Design Guidelines and Standards Masonry Standards

    construction drawings. FLASHINGS AND WEEPS Masonry flashing shall be composite copper/asphalt/kraft paper. (Refer to Sect, Unit Masonry, attached.) Polyvinyl chloride (PVC) flashing is prohibited. Weeps shall be cotton sash cord. (Refer to Sect.) Plastic tubes, open head joints, and weep vent systems are prohibited.

    Get price

    Handbook for Trail Design, Construction and Maintenance ...

     · Chapter Standards for Trail Construction. Chapter Trail Structures. Chapter Support Structures. Chapter Signs. Chapter Safety for Trail Workers. Chapter Maintenance. Chapter Selecting the Right Tool. Appendix Construction Specifications. Appendix 2 -Trail Evaluation Forms. Appendix 3 -Sign Samples. Appendix Eye Level Survey

    Get price

    BANK AND CHANNEL PROTECTIVE LINING DESIGN …

    This design manual was prepared to provide procedures and guidelines for the design of bank and channel protective linings. The objective of the manual is to achieve adequate protection against detrimental erosion by the most economical means. Data for design analyses have been assembled from selected sources for the convenience of the designer.

    Get price

    The George W. Woodruff School of Mechanical Engineering ...

    301 Moved Permanently. CloudFront

    Get price

    Basic Brick Construction

    a smooth, plastic-like consistency. 2. Make a dry run by laying a course of stretcher bricks along the chalk line for the entire length of the wall. Leave ½" between each brick for the head joints and mark the position of the bricks on the foundation with a piece of chalk. Lay this course without cutting

    Get price

    STANDARD CONSTRUCTION SPECIFICATIONS FOR …

    ASTM D Test for Plastic Limit and Plasticity Index of Soils AASHTO M Materials for Aggregate and Soil-Aggregate Subbase, Base, and Surface Courses AASHTO T -D Test for Moisture-Density Relations of Soils AASHTO T Test for Field Determination of Density of Soil In-Place

    Get price

    Stone Testing

    Rupture of Dimension Stone, ASTM C170, Standard Test Method for Compressive Strength of Dimension Stone, and ASTM C880, Standard Test Method for Flexural Strength of Dimension Stone test results are not suitable to use for horizontal (floor) applications where the thickness of the stone tile being used is less than 1¼".

    Get price

    Design Guidelines and Standards Masonry Standards

    construction drawings. FLASHINGS AND WEEPS Masonry flashing shall be composite copper/asphalt/kraft paper. (Refer to Sect, Unit Masonry, attached.) Polyvinyl chloride (PVC) flashing is prohibited. Weeps shall be cotton sash cord. (Refer to Sect.) Plastic tubes, open head joints, and weep vent systems are prohibited.

    Get price

    Underground Installation of PE Piping

    this method are mucky, organic, or loose and wet soils. Where the above conditions are met, the specifier can write installation specifications from the following steps. The specifier should insure that all OSHA, state and local safety regulations are met. The following are general guidelines for the installation of PE pipe. Other

    Get price

    Stream Crossings, Culvert Crossings and Limited Access …

    C. Design Data (print and use as a checklist) (Having this design data will get you through the design review part of a spot check) 1. Completed EE 2. Drainage area map of stream (If greater than 5 sq mi a permit is required and a copy of the letter of notification to the landowner will document this.) 3.

    Get price

    Chapter 6: Installation and Construction

    CHAPTER 6: INSTALLATION AND CONSTRUCTION For two, or more, parallel pipes in a common trench, properly compacted backfill is required between pipes. Minimum spacing between pipes may be satisfied by the following (see Table 2): Depending on the type of backfill, the compaction equipment and joining methods, these dimensions may need to be ...

    Get price

    Building construction materials

     · Stone • They are used in hydraulic structures like dams and bridges. • They are used in retaining wall masonry to retain soil. • They are used as road metal in road construction. • They are used as ballast for permanent way in railways. • They are used to make concrete in the form of coarse aggregate. 6. Brick Requirements of Bricks…

    Get price

    Temporary Diversion Methods (TDM) SM

    section). Use engineering judgment to determine if the temporary diversion design flow is adequate for the specific project. 6. Determine appropriate method of diversion. Follow the design steps for the selected method discussed below. Channel Diversion – For smaller streams, construction of dams and detention basins, or as

    Get price

    SECTION 1 PERMEABLE INTERLOCKING CONCRETE PAVEMENT

    2.03 CRUSHED STONE FILLER, BEDDING, BASE AND SUBBASE A. Crushed stone with 90% fractured faces, LA Abrasion < 40 per ASTM C 131, minimum CBR of 80% per ASTM D 1883. B. Do not use rounded river gravel for vehicular applications. C. All stone materials shall be washed with less than 1% passing the No. 200 sieve.

    Get price

    River Bank Protection

    Design methods for Riprap(Cont’d) •Riprap gradation Size of representative of stability of riprap is determined by the larger size of rock as these are not transported under given flow condition. Riprap with angular stone is more stable. For poor gradation of riprap a filter is placed between riprap and bank material From: Julien, 2002 8

    Get price

    STANDARD DETAILS of CONSTRUCTION

    37. h·1049 plastic barrel 38. h·1050 reinforced concrete pavement construction details (sh. 1 to 4) 39. h·1051 temporary wooden steps 40. h details for constructing areas of adjustment and transition sections 41. h limits of measurement for payment of temporary asphalt pavement 42. h·1055 pavement key type a, b , b , c 43.

    Get price

    DESIGN AND CONSTRUCTION OF DRY WELLS IN …

    2. Install dry wells after site construction has occurred and the site has been stabilized to prevent sedimentation and/or damage from construction activity. If construction of the dry well cannot be delayed, the dry well location must be protected with a berm, silt fence, or compost sock to prevent sediment from collecting in the area. 3.

    Get price

    Underdrain Construction Tutorial

    Construction Methods of Underdrains Although a relatively simple operation, the proper installation of underdrains plays an important role in determining the life of any type of pavement. The following presentation contains “Points of Emphasis” for construction of underdrains. It is …

    Get price

    Temporary Diversion Methods (TDM) SM

    section). Use engineering judgment to determine if the temporary diversion design flow is adequate for the specific project. 6. Determine appropriate method of diversion. Follow the design steps for the selected method discussed below. Channel Diversion – For smaller streams, construction of dams and detention basins, or as

    Get price

    Design criteria for infiltration

     · For design purposes, there are two ways of determining the soil infiltration rate. The first, and preferred method, is to field-test the soil infiltration rate using appropriate methods described below. The other method uses the typical infiltration rate of the most restrictive underlying soil (determined during soil borings).

    Get price

    Technical Notes

    • Snap-on design locks the ThermalClip® to the barrel loop creating a thermal break between the wire tie and the Pos-I-Tie® Barrel Screw. • The proprietery plastic material of the ThermalClip ® prevents dissimilar metals corrosion allowing the use of Stainless Steel Ties or Stone …

    Get price

    BANK AND CHANNEL PROTECTIVE LINING DESIGN …

    This design manual was prepared to provide procedures and guidelines for the design of bank and channel protective linings. The objective of the manual is to achieve adequate protection against detrimental erosion by the most economical means. Data for design analyses have been assembled from selected sources for the convenience of the designer.

    Get price

    STANDARD DETAILS of CONSTRUCTION

    37. h·1049 plastic barrel 38. h·1050 reinforced concrete pavement construction details (sh. 1 to 4) 39. h·1051 temporary wooden steps 40. h details for constructing areas of adjustment and transition sections 41. h limits of measurement for payment of temporary asphalt pavement 42. h·1055 pavement key type a, b , b , c 43.

    Get price

    CONSTRUCTION CROSS-SECTION DRAWINGS AND GUIDE ...

    drawing no. asphalt or concrete driveways. 2. plastic, steel, aluminum or precast concrete edging may be used. 3. 12" (300 mm) wide geotextile along perimeter turn up at curb (do not cover top of base) turn up at curb (do not cover top of base) thickness of base will vary with subgrade conditions and climate. note: on concrete base cambridge ...

    Get price

    Basic Brick Construction

    a smooth, plastic-like consistency. 2. Make a dry run by laying a course of stretcher bricks along the chalk line for the entire length of the wall. Leave ½" between each brick for the head joints and mark the position of the bricks on the foundation with a piece of chalk. Lay this course without cutting

    Get price